Emerita Resources Releases Drill Hole Data From Romanera Deposit and Updates Permitting Process at Paymogo / Romanera Project, Spain

Emerita Resources Releases Drill Hole Data From Romanera Deposit and Updates Permitting Process at Paymogo / Romanera Project, Spain

TORONTO, Oct. 15, 2020 (GLOBE NEWSWIRE) — Emerita Resources Corp. (TSX-V: EMO) (the “Company” or “Emerita”) has completed the digital compilation of the historical hard copy data for the Romanera Deposit, including for assay data, drill hole surveys and geological coding that will be required to develop 3D models.  Romanera is the larger of the two known deposits occurring on the Paymogo/Romanera Project (the “Project”) and occurs approximately 8 kilometers to the west of the Infanta Deposit (see news release September 9, 2020).  
The selected intervals are hosted within thicker zones of lower grade massive sulphide mineralization and as such do not correspond directly to the intervals described in Table 2 at the end of this release. A complete list of mineralized intercepts and hole locations are included in Table 2. For collar locations refer to Figure 3 below.
CBJ Newsmakers

Recommended
K92 Mining Conditionally Approved to Graduate to TSXFireweed Completes 2020 Drilling at Macmillan Pass With Additional Wide Intersections at Boundary West